Experience
WMK Consulting supports OSHPD/HCAI-regulated healthcare projects across California healthcare facilities, including multi-story tower work and active-campus construction environments.
Multi-Story Healthcare Tower Experience
- Regional Medical Center – San Jose
- Good Samaritan Hospital – San Jose
- Riverside Community Hospital – Seven-Story Tower
- Los Robles Medical Center – Thousand Oaks
Disciplined inspection oversight, coordination with structural and geotechnical engineers, and continuous interface with OSHPD/HCAI field offices within active healthcare environments.
Representative Project Types
- Multi-story hospital towers
- Emergency department expansions
- Surgical and specialty unit expansions
- Healthcare parking structures
- Central plant facilities
- Base-isolated construction systems
Selected HCAI project record
WMK is currently serving as Inspector of Record on ongoing work at Los Robles Medical Center, Thousand Oaks, with completion expected 2030–2031. See all projects →
| Project | HCAI No. | Value | Dates |
|---|---|---|---|
| Riverside Community Hospital 7-Story Patient Tower (285,000 sq ft), Riverside | G131324-33-00 | $460 million | 2013–2020 |
| Seismic Upgrade Renovation & New 4-Story Tower, Regional Medical Center of San Jose | IS102399-0 | $140.41 million | 2010–2021 |
| Hospital Expansion & Renovation incl. two-story patient wing, Regional Medical Center of San Jose | HS032305-0 | $61.16 million | 2003–2018 |
| Emergency Department Expansion, Riverside Community Hospital | S193070-33-00 | $21.35 million | 2019–2021 |
| Women and Children Center, Good Samaritan Hospital, San Jose | HS011675-0 | $22.00 million | Completed |
| Surgery Expansion, Los Robles Hospital & Medical Center, Thousand Oaks | H182155-56-00 | $15 million | 2019–2025 |
| Med/Surg & ICU Tenant Improvement, Good Samaritan Hospital | SS091287-0 | $12.11 million | Completed |
| Emergency Department Addition & NPC-4 Upgrades, Regional Medical Center of San Jose | HS101631-0 | $11.36 million | 2010–2017 |
| NICU Expansion, Riverside Community Hospital | S191325-33-00 | $11.22 million | 2019–2023 |
| Surgery Expansion, Riverside Community Hospital | S151044-33-00 | $9.41 million | 2015–2019 |
Problems solved in the field
CFA piles restarted in six days
Riverside Community Hospital 7-Story Tower
When the production CFA-pile method was stopped in 2015, WMK retained Dan Brown and Associates, whose field review validated grout-volume control and confirmed the piles were sound. OSHPD accepted the method and installation resumed within six calendar days.
Contractor reference: Greg Hutson, VP Healthcare, Martin Bros. / Marcowall, worked with WMK on Riverside Tower G. Read his letter (PDF) →
Unnecessary fireproofing avoided
Los Robles Surgery Expansion
WMK obtained an independent code analysis from Capital Code Consultants confirming CBC 715.1, Exception 8 applied, and KPFF determined the roof tube was not a primary or secondary structural member, so it remained in place without additional fireproofing and joint-system work.
Two months of review saved
Good Samaritan Women’s & Children’s Center
A multipage Amended Construction Document for a third-floor buildout above an operating NICU was approved through the field review process. Mindy Koenig coordinated directly with the architect and OSHPD field staff, avoiding an estimated two months of Sacramento review while the NICU stayed open.
Firms we have worked with
General contractors: Layton Construction, DPR Construction, Bernards, McCarthy, Skanska.
Architects: Devenney Group, Perkins & Will, Haynes & Oakley, HKS Architects.
Engineers: KPFF, Degenkolb, WSP, Dan Brown and Associates, Capitol Code Consultants.
Highlighted Experience – Channing House Base Isolation Project (Palo Alto)
WMK Consulting served as both Inspector of Record and project manager on an OSHPD/HCAI-regulated base-isolated construction project at Channing House in Palo Alto. Channing House is an 11-story continuing-care retirement community that remained fully occupied while it was retrofitted with a base-isolation system designed for 17 inches of movement. According to the project’s structural engineer, Rinne & Peterson, it was the first base-isolated retrofit project approved by OSHPD. In May 2002 the Board of Trustees unanimously adopted a resolution recognizing Bill’s management of the project and his success in “solving seemingly unsolvable problems.”
View Board Resolution – Channing House (PDF) HCA Letter of Reference (PDF)
Planning an HCAI project?
Talk directly with the people who will be in the field.
Contact WMK Consulting