Multi-Story Healthcare Tower Experience

  • Regional Medical Center – San Jose
  • Good Samaritan Hospital – San Jose
  • Riverside Community Hospital – Seven-Story Tower
  • Los Robles Medical Center – Thousand Oaks

Disciplined inspection oversight, coordination with structural and geotechnical engineers, and continuous interface with OSHPD/HCAI field offices within active healthcare environments.

Representative Project Types

  • Multi-story hospital towers
  • Emergency department expansions
  • Surgical and specialty unit expansions
  • Healthcare parking structures
  • Central plant facilities
  • Base-isolated construction systems

Selected HCAI project record

WMK is currently serving as Inspector of Record on ongoing work at Los Robles Medical Center, Thousand Oaks, with completion expected 2030–2031. See all projects →

ProjectHCAI No.ValueDates
Riverside Community Hospital 7-Story Patient Tower (285,000 sq ft), RiversideG131324-33-00$460 million2013–2020
Seismic Upgrade Renovation & New 4-Story Tower, Regional Medical Center of San JoseIS102399-0$140.41 million2010–2021
Hospital Expansion & Renovation incl. two-story patient wing, Regional Medical Center of San JoseHS032305-0$61.16 million2003–2018
Emergency Department Expansion, Riverside Community HospitalS193070-33-00$21.35 million2019–2021
Women and Children Center, Good Samaritan Hospital, San JoseHS011675-0$22.00 millionCompleted
Surgery Expansion, Los Robles Hospital & Medical Center, Thousand OaksH182155-56-00$15 million2019–2025
Med/Surg & ICU Tenant Improvement, Good Samaritan HospitalSS091287-0$12.11 millionCompleted
Emergency Department Addition & NPC-4 Upgrades, Regional Medical Center of San JoseHS101631-0$11.36 million2010–2017
NICU Expansion, Riverside Community HospitalS191325-33-00$11.22 million2019–2023
Surgery Expansion, Riverside Community HospitalS151044-33-00$9.41 million2015–2019

Problems solved in the field

CFA piles restarted in six days

Riverside Community Hospital 7-Story Tower

When the production CFA-pile method was stopped in 2015, WMK retained Dan Brown and Associates, whose field review validated grout-volume control and confirmed the piles were sound. OSHPD accepted the method and installation resumed within six calendar days.

Contractor reference: Greg Hutson, VP Healthcare, Martin Bros. / Marcowall, worked with WMK on Riverside Tower G. Read his letter (PDF) →

Unnecessary fireproofing avoided

Los Robles Surgery Expansion

WMK obtained an independent code analysis from Capital Code Consultants confirming CBC 715.1, Exception 8 applied, and KPFF determined the roof tube was not a primary or secondary structural member, so it remained in place without additional fireproofing and joint-system work.

Two months of review saved

Good Samaritan Women’s & Children’s Center

A multipage Amended Construction Document for a third-floor buildout above an operating NICU was approved through the field review process. Mindy Koenig coordinated directly with the architect and OSHPD field staff, avoiding an estimated two months of Sacramento review while the NICU stayed open.

Firms we have worked with

General contractors: Layton Construction, DPR Construction, Bernards, McCarthy, Skanska.
Architects: Devenney Group, Perkins & Will, Haynes & Oakley, HKS Architects.
Engineers: KPFF, Degenkolb, WSP, Dan Brown and Associates, Capitol Code Consultants.

Highlighted Experience – Channing House Base Isolation Project (Palo Alto)

WMK Consulting served as both Inspector of Record and project manager on an OSHPD/HCAI-regulated base-isolated construction project at Channing House in Palo Alto. Channing House is an 11-story continuing-care retirement community that remained fully occupied while it was retrofitted with a base-isolation system designed for 17 inches of movement. According to the project’s structural engineer, Rinne & Peterson, it was the first base-isolated retrofit project approved by OSHPD. In May 2002 the Board of Trustees unanimously adopted a resolution recognizing Bill’s management of the project and his success in “solving seemingly unsolvable problems.”

View Board Resolution – Channing House (PDF) HCA Letter of Reference (PDF)