Managing the TIO Program
For hospital owners: what the Testing, Inspection and Observation (TIO) program is, why it controls your path to occupancy, and how WMK manages it from preconstruction through closeout.
What is a TIO?
The TIO is an HCAI form for each regulated hospital project. The design team, the architect and engineers of record, prepares it, and HCAI approves it along with the construction documents. It lists every test, special inspection and observation the project requires, such as concrete and soil testing, welding and bolting inspection, anchorage, fireproofing and firestopping, and structural observations, and it names who is responsible for each one.
Why it matters to you
- It defines what must be verified and documented before HCAI will sign off on the work.
- Every item has to be completed and reported before HCAI can approve occupancy.
- A missing test report, signature or deferred approval can hold up occupancy even when construction is finished.
We don't look for problems, we look for solutions.
Our job is to help the work pass, not catch it failing. A well-run TIO means issues are settled before they reach the field, and the paperwork is ready when the building is.
How WMK manages the TIO
Preconstruction
We review the approved documents, the TIO program, deferred approvals, phasing and critical inspection points. We set up the inspection matrix, TIO responsibilities, the deferred-approval register, reporting standards and closeout requirements before work starts.
Special inspections and testing
We coordinate the approved testing agencies and qualified special inspectors under the TIO. The lead IOR reviews every special inspection report, escalates failed tests, and files the reports so they are ready for HCAI.
Scheduling from the look-ahead
Inspection coverage, including after-hours and weekend work, is scheduled from the contractor's two-week look-ahead, so inspectors and labs are there when the work is ready.
Daily documentation
Our document control staff keep inspection reports, test logs, TIO tracking, deferred approvals and VCR status current every day. Our files mirror the approved TIO by project phase, so missing signatures or evidence show up early.
Phased occupancies
The lead IOR monitors the TIO for the required sign-offs throughout construction. Before each HCAI construction-verification milestone, we reconcile the TIO requirements against field activity and test results so each phase can open on time.
Closeout
At the end we reconcile VCRs, finish final testing, support HCAI field visits, and assemble the closeout records and verified compliance reports, with no last-minute document chase.
Closing Projects on Time
WMK generally closes projects on the day they need to be closed.
When the contractor is 100% finished and we call HCAI (formerly OSHPD), our projects are generally closed the same day or within a couple of days. That is because the TIO documentation, inspection reports and verified compliance reports are already complete and current, so you are not waiting on paperwork to open your building.
Same-Day Inspections
Inspections are generally closed the same day the contractor submits them, as long as the work is 100% finished.
If the work isn't 100% finished, we generally set the inspection aside and give the contractor a list of what's needed to complete it. We don't reject projects or inspections out of hand.
Our goal is to find solutions, not problems. When we go out for an inspection, we're not looking for problems, we're looking for solutions.